Week 3. Basement walls have been poured

I made it to the lot around mid-day on Thursday Nov 14th. Mike met me out there and we walked around and talked about the work planned for the shortened next week and the following week. The shortened week will have the basement slab poured, 2 ft of pea gravel over the perimeter drain tiles and backfilling around the exterior of the house. Holly and I will be meeting Mike at the lot on Wednesday for a walkaround review. Following the review, it will be off to Santa Claus for some Turkey! Framing will start the week after Thanksgiving.

Still standing on the same dirt pile. 3 car garage. 1 near and 2 far with a workspace in between.Looking at the basement proper of the house. The green on the outside is a foam that is part of the basement waterproofing.
Looking down the far wall. The stair stepping countours the land and will be bricked from there up and backfilled up to the brick.
Standing in the basement (near the 1 car garage bay) and looking over to the chimney. Tiered window well on the left.
From same stop looking NW toward the "in-law" room.
Standing at bottom of hill looking up at the front door.
Slinging pea gravel into the garage. This will be filled up completely with gravel and a cap poured on top after some settling.