Week 3. Basement walls have been poured
I made it to the lot around mid-day on Thursday Nov 14th. Mike met me out there and we walked around and talked about the work planned for the shortened next week and the following week. The shortened week will have the basement slab poured, 2 ft of pea gravel over the perimeter drain tiles and backfilling around the exterior of the house. Holly and I will be meeting Mike at the lot on Wednesday for a walkaround review. Following the review, it will be off to Santa Claus for some Turkey! Framing will start the week after Thanksgiving.
Still standing on the same dirt pile. 3 car garage. 1 near and 2 far with a workspace in between.