We met Mike and the Landscape Architect (Jim Traggesser) out at the lot today to discuss the front wall. The good news - the wall won't be quite so tall as the photo below and will be stepped down twice as it goes from the front door to the garage. Bad news - It's so tall that according to Code, it will need a wrought iron fence along the top.
The painters are still working on coat 1 of the interior. Kitchen tops and island installed and the remainder are in the garage waiting to be installed. The brick and stone has made it up to the top-most eave and should be completed by next Wednesday. Lighting is about 60% hung.
Starting on Friday and throughout the weekend the tile men put down the underlayment and will be tiling all next week. Flooring (not carpet) should be complete by the end of this coming week.
 |
| The mason suggested the brick work at the top of the eave. The initial plan had stone all the way up. Good suggestion! |
 |
| The left side as shown is out near the driveway and will be about 16-20 inches shorter when complete. |
 |
| Green in downstairs 1/2 bathroom. Sherwin Williams- Softened Green. (if there's no shower/tub why is it still a bathroom?) |
 |
| Kitchen countertops are installed |
 |
| Head of flooring installer laying subfloor for slate. |
 |
| Handrails installed. Entry hallway is SW "Nomadic Desert" |
 |
| Spare bedroom. SW- "Watery" |
 |
| Noel and Xavier's room. SW-Regale Blue |
 |
| I can't figure out how to turn this photo in Blogger. Laundry Room. SW - Nomadic Desert |