I'm a week late on the text for this post. 

Last week most of the flooring (non-carpet) was down including the kitchen and eating area.  Long story there which I'll cover in the next post.  The front wall was capped and dirt was backfilled.  The back porch was capped with concrete and the side posts/screen were installed.

The tile folks have also been at work on the master bath shower and tub.


Flooring at entrance and dining room.  Looking at it now it reminds me of a basketball court.


Front door from inside


Formal Dining Room.  I like the red.  I like the cherry.  Not sure if I like them together.  SW - Wild Currant


Hall Bathroom.  SW - Watery


Hall Bathroom


Wall complete and capped.  Fence is coming soon.




Back porch is complete and screened but needs some paint.  Patio has been flagged off and dirt removed.


Master Bathtub

Master shower with seat