We're in the home stretch now! Likely about 2 weeks left to go. These are some photos from the inside this past weekend. The plumbing and lighting are all done.
On the inside this week, the painters are finishing touchups where nail pops were repaired and getting the final stain on some pieces. Cleaning folks will be giving the house a full cleaning from top to bottom (lots 'o dust). On the outside, the front, side, and rear patio are poured. Front walk will be finished and driveway may go in later in the week.
In the far back of our property there were some drainage issues that Mike reviewed with Johnson County. They agreed that the drainage was set up incorrectly per the Highland Park Plat and will be preparing a letter to the HOA detailing the issue and asking them to fix it.
 |
And well it does end! This still has grout haze on it but the floor is MUCH improved. |
 |
Master Shower |
 |
Cordelia shows off her bathroom and wrap around mirrors in the hall bathroom.
|
 |
Turn head to right. Hall bathroom shower/tub. |
 |
I think Xavier's eyes may match the paint. |